Construction is humming along!  Plumbing and HVAC installation continues.  Interior walls will begin going up this week and our own “Green Monster” is now nearly covered in a black water-proofing product. Eventually, siding will be installed over it all.  Windows and the back stair case are scheduled to be installed next week and insulation will begin in about three weeks.

We are delighted to report that, thanks to many donations from the community totaling $125,000, the challenge from The Peter and Elizabeth C. Tower Foundation has been met!  The Foundation is providing a matching grant of $125,000 in support of the CHC-wide health information technology upgrade associated with the expansion.  Thanks to all of you who helped make this opportunity possible.